October 2021: The team is currently working on finalizing their designs and narrowing them down to one design to then be implemented in CAD software.

December 2021: Final design and working drawings approved by advisors
 

November 2021: Design narrowed down to one, 3D modeling, and ANSYS analysis

Screen Shot 2022-02-16 at 10.39.35 AM.png

September 2021: Preliminary research period over and the team moved onto creating their first drawings. Preliminary budget was also created.

August 2021: First preliminary designs were created.

June 2021: Began research for available cargo rack designs on the market 

Screen Shot 2022-02-16 at 10.39.28 AM.png

January 2022: Purchasing and general manufacturing begins.